Commercial Roofing Project

Rocky Top led the construction operations for three buildings for the South University Professional Suites buildings which included re-roofing three buildings damaged in a hail storm in 2012. The severe hail storm not only damaged the roofs, but also considerably damaged the gutters as well. In addition to re-placing the damaged roofs and gutters, Rocky Top matched the exterior paint to the existing colors of the complex.

 

Rocky Top worked collaboratively with the project owner and the insurance company to ensure all three buildings were restored to original condition. Rocky Top was able to successfully restore the complex within three weeks of notice of award. This project was completed within the agreed timeline and without a safety incident.

 
 
 

Multi-Family Roofing Project

Rocky Top handled the reconstruction efforts of the Fox Run at Centennial Condominiums after a hail storm in 2012. The hail storm damaged the roofs, windows, gutters, trim and fascia, siding, garage doors and the roof ventilation system. While working in conjunction with the project owner and the insurance company, Rocky Top was able to successfully restore the multi-family complex to its original condition within three weeks of notice of award.

 

Rocky Top re-roofed all of the structures which included three multi-family buildings, four parking garages and the community club house. In addition to replacing the damaged roofs, the Rocky Top team replaced damaged gutters, windows, siding, trim and fascia, garage doors and painted the exterior to match the original colors of the complex.

 

Farm and Ranch Roofing Project

Rocky Top managed the repairs to the Friends of Horses Rescue and Adoption after the facility was hit with a hail storm in 2012. The storm caused extensive damage to the roofs and gutters of three buildings. Rocky Top worked hand-in-hand with the project owner to insure the insurance company fully covered the repairs caused by the hail storm. As a result, Rocky Top was able to restore the complex to its original condition.

 

Rocky Top re-roofed and replaced the gutters of all of the hail damaged structures In addition to replacing the damaged roofs and gutters, the Rocky Top team matched the exterior paint with the existing colors. This project was completed within the agreed timeframe and there were zero safety incidents.

 
 
 
 

Gutter Project

Rocky Top completely repaired or replaced the entire gutter system for four multi-family buildings in Englewood, CO.  Due to years of neglect,  the gutters were overran with dirt, rocks, leaves and pine needles.  The gutter system was failing and starting to become a danger to the residents. 

 

With the help of Rocky Top professionals, the crews were able to clear the gutter system of all debris and replaced failing systems with custom-made gutters. All downspouts were either replaced or repaired.  The team also replaced all of the concrete splash blocks around the complex.